Factory production

A factory with BOMs, work orders and material shortages

A factory needs to know what to make, whether the components are there, and what the batch actually cost.

Business profile

Business
Light manufacturing plant
Sells
Manufactured goods
Operating model
BOM production with MRP and work orders
Multilevel BOMMRPCapacity planningTimesheetsShop floorWork ordersInventoryPurchasingQualityProjectsBusiness agentBI
Zubda new work order with BOM, quantity, due date and operations

The challenge

  • Production planned without component availability
  • Material shortages discovered on the line
  • Batch cost unknown
  • Finished goods and components mixed

How it is set up

  1. Define the BOM

    Components, quantities, waste, labour and output quantity for each product.

  2. Check demand

    Use MRP suggestions to compare open sales demand with on-hand stock.

  3. Plan the work order

    Choose BOM, location, quantity, due date and operations.

  4. Release and complete

    Release creates the assembly plan; completion consumes components and adds finished stock.

Daily routine

  • Review MRP shortages
  • Release work orders
  • Track operations and downtime
  • Complete batches and review actual cost

Worked numbers

Products

40

BOM levels

2–3

Work orders/week

12

Batch size

50–500

Scrap

Tracked

Controls that matter

  • MRP checks demand, supply and safety stock
  • Capacity shows overloaded work centres
  • Shop-floor material issue and backflush move stock once
  • Quality check before finished stock
  • Actual cost and scrap reviewed against BOM