Factory production
A factory with BOMs, work orders and material shortages
A factory needs to know what to make, whether the components are there, and what the batch actually cost.
Business profile
- Business
- Light manufacturing plant
- Sells
- Manufactured goods
- Operating model
- BOM production with MRP and work orders
Multilevel BOMMRPCapacity planningTimesheetsShop floorWork ordersInventoryPurchasingQualityProjectsBusiness agentBI

The challenge
- Production planned without component availability
- Material shortages discovered on the line
- Batch cost unknown
- Finished goods and components mixed
How it is set up
Define the BOM
Components, quantities, waste, labour and output quantity for each product.
Check demand
Use MRP suggestions to compare open sales demand with on-hand stock.
Plan the work order
Choose BOM, location, quantity, due date and operations.
Release and complete
Release creates the assembly plan; completion consumes components and adds finished stock.
Daily routine
- Review MRP shortages
- Release work orders
- Track operations and downtime
- Complete batches and review actual cost
Worked numbers
Products
40
BOM levels
2–3
Work orders/week
12
Batch size
50–500
Scrap
Tracked
Controls that matter
- MRP checks demand, supply and safety stock
- Capacity shows overloaded work centres
- Shop-floor material issue and backflush move stock once
- Quality check before finished stock
- Actual cost and scrap reviewed against BOM